Sample Construction Contract Agreement Philippines

5. That construction begin on January 1, 20__ 3. That the Contractor will finalize and leave the mentioned coffee at the mentioned contract price and in accordance with the plans and specifications 7. That the owner agrees to pay 30% of the contract price at least 5 working days before the scheduled start date in the form of a deposit and the balance of 70% to be paid in identical weekly payments based on the date of signature until the expected completion of the project. Any additional fees must be paid as required. 2. The contractor shall be responsible for the purchase of materials, the recruitment of staff, coordination with the architect and the owners with regard to the design details and the approval of the materials. 1. That the contractor agrees to complete / renovate ABC COFFEE SHOP at (address) at the price of the Pesos contract: 000.000,00 (amount in words).

4. That the contractor must pay a penalty of 1% of the contract price for each day of turnover delay. CONSIDERING that the company wishes: That the contractor does not indicate the planning and construction OF THE RENOVATION AND MODERNIZATION OF NEURO-WARD (herein referred to as “works”) and that the company has accepted the offer for twelve million of nine hundred and seventy-two pesos and ninety-seven Centavos (Php 12.906.632,87) by the contractor for the execution and completion of these correction works. ACCORDINGLY, the Parties have ensured that this Agreement is first executed on the day and year preceding the conclusion. CONSIDERING that all the work of this project, as covered by this contract, must be completed within 180 calendar days (one hundred and eighty) in accordance with the provisions of the offer documents. Submit the plan as constructed, duly signed by a sanitary engineer from the Republic of the Philippines under licenseDEPARTMENT OF HEALTHCenter for Health Development Davao RegionSOUTHERN PHILIPPINES MEDICAL CENTERJ.P. Laurel Avenue. Davao City THAT WE, (name of the contractor), adults, singles/married, inhabitants of (address), hereinafter referred to as CONTRACTANTs and (name of the owner), adults, single/married, an inhabitant of (address) and hereinafter referred to as the owner, we accept and specify: 9. That the conservation guarantee will be released no later than two (2) weeks after the owner`s acceptance of the renovation carried out.

Use plaster cardboard as a ceiling, ennobbed with a sealing layer and followed by two matte silk enamels with cut surface Install the system of suspended ceiling beams, as shown on the reflected plan of the ceiling Install 12 x 12 Mariwasa ceramic floor tiles (Montalban Beige & Red). Install an automatic voltage regulator for the water purification system Install 12 mm thick tempered clear windows (exterior walls) with floor frame according to Elevation worktops 1, 2 and 3) Install high-density polypropylene (PP-R) pipes for the water pipe And install plywood meters with a surface area of 12 mm. . All wetlands with Hygard, Thoroseal or permitted equivalents, cabinet doors, laminates and other details on surfaces: in accordance with specification 8. That 10% of the payments to the contractor are withheld by the owner as a guarantee for the completion of the work. layout and installation of power lines, lines, boxes, circuit breakers, convenience sockets and electrical devices for appliances, panels and telephone lines THIS AGREEMENT, concluded on January 8, 2015 between southern philippines medical center with office address in Bajada, J.P. Laurel, Davao City (hereinafter referred to as “ENTITY”) and RIEZL LANDCARE & CONSTRUCTION, with main address in Cor. Mamsa-Tulingan Street Brgy. Wilfredo Aquino, Agdao District, Davao City (hereinafter referred to as “CONTRACTOR”). Contract name: DESIGN AND CONSTRUCTION OF THE RENOVATION AND MODERNIZATION OF NEURO-WARD Manufacture of 3mm of metallic decorative beads in antique color version, tiles and finishes Interiors as indicated in the Schedule of Finishes Install pencil luminaires, special drop lights, recessed luminaires, halogen directional lamps and other electrical requirements, as shown in the plans…